As a professional AAC block machine manufacturer and AAC production factory in China, we provide one-stop turnkey solutions for AAC production lines, aerated concrete plants, and complete AAC block manufacturing plant projects. We serve new factory startups, production capacity expansion projects and industry investors, offering customized solutions for both AAC block production lines and AAC wall panel production lines.
We design and manufacture customized AAC block plant turnkey projects with annual output ranging from 50,000 to 500,000 cubic meters. All production lines can be fully customized according to customer requirements.
AAC Block Production Line
Equipped with high-efficiency AAC block making machines, pouring mixers, slurry tanks, belt conveyors and industrial autoclaves, our complete aerated concrete equipment meets the whole production demands. We support both fly ash and sand-lime raw material formulas. Finished AAC blocks feature stable density of 500–700 kg/m³ and precise dimension accuracy, fully compliant with international AAC industry standards.
AAC Panel Production Line
Our advanced AAC panel production equipment includes automatic cutting, steam curing and finished processing systems, covering AAC slabs, ALC wall panels and integrated AAC block & panel combined plants. Widely used in prefabricated buildings, interior partition walls and exterior wall cladding projects.
We deliver low-risk and high-efficiency one-stop services for automatic autoclaved aerated concrete production lines, covering the whole project cycle.
2.1 Preliminary Planning & Solution Design
We conduct on-site layout planning, select matched equipment configuration, and provide accurate factory layout design, equipment selection and budget quotation, helping customers avoid ineffective investment.
2.2 Complete Equipment Manufacturing & Supply
As a direct factory manufacturer, we independently produce all core AAC equipment with strict quality inspection. All machines are highly compatible to ensure stable and continuous operation of the entire AAC plant.
2.3 On-site Installation, Commissioning & Acceptance
Our professional engineering team with over 10 years of overseas experience provides on-site installation, equipment commissioning and environmental assessment services, ensuring all projects meet local safety and environmental protection regulations.
2.4 Technical Training & Long-term After-sales Support
We provide professional operation and maintenance training for on-site workers and control room operators. 1 to 3 months of on-site technical support is available to help customers reach full design production capacity quickly.
• Short Project Cycle: Optimized production and construction process shortens the overall project cycle from 12–18 months to 6–10 months, accelerating customers’ market layout and profit cycle.
• Low Investment Risk: Integrated design and supporting equipment matching eliminate equipment incompatibility and process defects, effectively protecting your AAC plant investment.
• Stable Product Quality: Strict raw material inspection and production quality control keep the product defective rate below 3%, ensuring stable AAC block price and strong market competitiveness.
| Annual Capacity | Power | Daily Productivity | Duty Cycle | Autoclaves | Investment |
|---|---|---|---|---|---|
| 50,000 m³/year | 400 kW | 166 m³/day | 10 hours | 2 (Φ2×26.5) | 600,000 USD |
| 100,000 m³/year | 500 KW | 333 m³/day | 10 hours | 4 (Φ2×31.5) | 800,000 USD |
| 150,000 m³/year | 630 KW | 500 m³/day | 10 hours | 6 (Φ2×31.5) | 1,100,000 USD |
| 200,000 m³/year | 720 KW | 666 m³/day | 10 hours | 8 (Φ2×31.5) | 1,500,000 USD |